Construction & Trades
Insurance for the project itself, set up to match the contract from ground-break to occupancy.
Get a quoteIn short
A construction project in Canada usually needs builder's risk (course of construction) insurance on the work itself, liability for everyone on site through each contractor's CGL or a project wrap-up policy, and contractors' equipment, pollution and auto cover. On CCDC contracts, CCDC 41 sets the minimums, including broad form property at 1.1 times the contract price. Owners and developers add soft costs, delay in start-up and surety bonds.
Last reviewed
Construction insurance at the project level protects what each trade's policy doesn't: the building while it is being built, the liability of everyone on one site, and the money tied up in the schedule. Builder's risk covers the work and materials. A wrap-up can put every contractor under one liability policy. Soft costs and delay in start-up protect the owner's financing and rent.
We work with owners, developers, custom home builders, construction managers and general contractors to set up the program the contract calls for, often CCDC 41, and to keep it right through change orders and handover. For trade-level cover, see our contractor insurance guide, and for the full sector, construction and contractor insurance.
Every contractor carries its own insurance for its own business: liability, tools, vehicles. That is covered in our contractor insurance guide. Project insurance is different. It is bought for one building or job, it names the parties to that job, and it ends when the project is finished or occupied.
Three things need insuring on a project. The work itself, which can burn, flood or be stolen before anyone moves in. The liability of everyone on site to the public, neighbours and each other. And the money behind the job: financing costs, rent or profit lost to a delay, and the guarantee that the contractor will finish and pay its subs. Who buys each piece is set by the contract, not by habit. For the wider sector, including trade-by-trade coverage, see construction and contractor insurance.
The parties to a project each carry different pieces. The table shows the usual split. The contract can change any line, so read it before assuming.
| Party | Usually arranges | Also needs |
|---|---|---|
| Owner or developer | Builder's risk when the contract makes it the owner's job, soft costs and delay in start-up, a wrap-up on larger projects | Its own CGL as owner, residential surety for development agreements and deposits |
| General contractor (stipulated price) | Broad form property and $10M CGL under CCDC 41, contractors' equipment, pollution liability, bonds when required | Certificates and WSIB clearances from every sub |
| Construction manager | Depends on the CCDC 5A or 5B form chosen and the owner's amendments | Professional liability where it gives advice the owner relies on |
| Custom or contract home builder | Builder's risk for the house, CGL with completed operations | In Ontario, a new home builder licence and warranty enrolment |
| Trade contractors | Their own CGL, tools and auto; installation floater for their work | Coverage matching the GC's or CM's subcontract terms |
Builder's risk, also called course of construction, covers the project while it is being built or renovated: the work, materials on site, in transit and in storage, and temporary works, against fire, theft, vandalism, windstorm and other insured damage.
CCDC 41 (2020) requires broad form property with a limit of at least 1.1 times the contract price plus the value of owner-supplied products and design services, a deductible no higher than $10,000, and coverage no less than IBC Forms 4042 and 4047. It also requires boiler and machinery insurance on permanent or temporary boilers and pressure vessels forming part of the work, including hot testing and commissioning. That last item is often missed on mechanical-heavy projects.
Set the limit from the contract, not an early estimate, and update it with change orders. Statistics Canada's non-residential building construction price index rose 3.5% year over year in the second quarter of 2026, so an old number can leave a rebuild short. Owners with financing or tenants waiting should add soft costs and delay in start-up. Our post insuring the project before it exists covers start dates and occupancy.
On larger projects, liability is often arranged as a wrap-up: a single project-specific commercial general liability policy that covers the owner, general contractor or CM and all subcontractors for work on that site, with a completed-operations period after the project ends.
Most Canadian commercial and institutional projects use Canadian Construction Documents Committee forms. The form decides the relationship. CCDC 41, CCDC Insurance Requirements, sets the insurance.
| Form | Use | Insurance question to settle |
|---|---|---|
| CCDC 2 (2020) Stipulated Price Contract | Owner and general contractor, fixed price | The contractor usually carries CCDC 41 coverage; confirm any owner amendments |
| CCDC 3 (2016) Cost Plus Contract | Owner and contractor, cost plus a fee | Whether insurance premiums and deductibles are a reimbursable cost |
| CCDC 4 (2023) Unit Price Contract | Work measured and paid by unit | Builder's risk limit as quantities change |
| CCDC 5A and 5B (2010 and 2025) Construction Management Contracts | CM for services, or for services and construction | Whether the CM or the owner buys project insurance, and the CM's professional exposure |
| CCDC 14 (2013 and 2026) Design-Build Stipulated Price Contract | One firm designs and builds | Professional liability for the design, which CGL excludes |
| CCDC 17 (2010 and 2025) Trade Contractors on CM Projects | Trade contractors hired under a CM | Flow-down limits, additional insured status and wrap-up participation |
CCDC 41 (2020) also asks for $10,000,000 auto liability, all risks contractors' equipment with no subrogation against the owner (see tools and equipment), $5,000,000 contractors' pollution liability and $5,000,000 drone liability if drones are used. Owners often amend it or attach an older edition, so send us the insurance section before tender close. Our post on why contracts ask for a certificate of insurance covers additional insured and notice wording.
These scenarios are hypothetical. They show how the pieces of a project program fit together, and where gaps appear.
| Hypothetical scenario | Loss | Policy that responds |
|---|---|---|
| Temporary heat starts a fire at 70% complete | Damage to the work and a five-month delay | Builder's risk for the rebuild; soft costs and delay in start-up only if bought |
| Copper wire stolen from an unfenced site over a long weekend | Theft of materials | Builder's risk, subject to its security conditions and deductible |
| A crane load strikes the neighbouring building | Third-party property damage | The contractor's CGL or the project wrap-up |
| A boiler fails during hot testing and damages the mechanical room | Damage during commissioning | Boiler and machinery cover, which CCDC 41 requires for the work |
| Tenants move into the ground floor before the policy is changed | Coverage ends on occupancy | Possibly nothing; arrange permanent property cover before anyone moves in |
| The general contractor fails halfway through | Cost to complete and unpaid subs | Performance and labour and material payment bonds, if they were required |
Several statutes put insurance and security obligations on the parties to a project. These are the Ontario rules we see most. Other provinces have their own lien, warranty and workers' compensation regimes, and we confirm the rules for each project's province.
The riskiest day for a project program is often the day the building starts being used. Builder's risk typically ends at completion, acceptance or occupancy, and some wordings end it when any part of the project is used for a purpose other than construction. The owner's permanent commercial property policy must start the same day.
Liability shifts too. Once the work is handed over, injury or damage caused by it falls under completed operations. CCDC 41 sets a separate $10,000,000 completed-operations aggregate for that reason. Builders and contractors should keep that coverage in place for as long as their contracts require, and owners should hold a certificate of insurance showing it.
Builder's risk is priced on the completed value of the project, its construction type, duration and location. Wood frame costs more than non-combustible construction. Site security, fire prevention, hot work permits, temporary heat management and water damage controls all move the rate, as do the deductible and any soft cost, delay or flood extensions.
Wrap-up liability is rated on the construction value and the mix of trades, with a completed-operations period paid for up front. A trade contractor's own CGL is rated on revenue or payroll. Experience counts: insurers want to see the builder's track record on similar projects, its subcontractor controls and its claims history. Marsh reported Canadian commercial property rates down 8% in the third quarter of 2026, which helps project buyers, but underwriters still price wood frame and long projects carefully.
Good to know
Sources
This page is general information, not insurance or legal advice. Coverage depends on your policy wording and the insurer. Speak with a licensed broker about your situation.